Milestone Trial-2
Trial-2 is code release needed by the time most of the B4 units get to the country trials - July 23 is release date. The first date of interest is feature freeze on 6/26/07. Then we will get a candidate release each Friday until Monday, July 16, which will be release candidate 3 and Code Freeze. Final release is set for 1 week later, Monday July 23. Below is a list of features that are expected to meet the feature freeze date.
Complete: 8/3/07.
Features:
- X keysyms and keyboard fixes, if ready. (#663, #1276)
- XO Activation with USB stick
- Low level security support (kernel and firmware)
- Support for manual backup/restore with School Server
- Manual XO updates, don't lose user data
- School Server support for activation of multiple XOs
- Power management, suspend/resume
- Journal with basic views, everything must be 'openable'
- XMPP, Salut
- Link local automatically (manually, if not automatically)
- Basic activities: Read, Write, Camera, Paint, Browse, Chat, eToys, TamTam, Watch and Listen
- Collaboration support for all basic activities with Server or AP
- Collaboration support with mesh only (no server needed) for Read, Abiword, Paint, eToys
- Mesh UI improvements - basic search/filter, invites, limited Group ('friends'), badges/states of connectivity
- FC7, python 2.5
- IPv6 (for management, remote support)
- Mesh beacons
- Programmable anycast
- WPA, WiFi Compatability
- Mfg Tracking Server
- Other Activities (may not be available in taskbar): Newsreader, Journal, Library, Develop (console only), Block Party, Turtle Art (this list is still being worked)
- New SD driver from upstream
Details can be found in trac items or design specs. Activities that are shipping can be found here: <http://wiki.laptop.org/go/Activities>